CDM Regulations

 

Construction (Design and Management) Regulations 2015

The Construction (Design and Management) Regulations 2015 (CDM 2015) cover the management of health, safety and welfare when carrying out construction projects. CDM 2015 replaced the Construction (Design and Management) Regulations 2007 (CDM 2007) from 6 April 2015, from this date, the Approved Code of Practice which provided supporting guidance on CDM 2007 was withdrawn.

Whatever your role in construction, CDM 2015 aims to improve health and safety in the industry by helping you to:

  • sensibly plan the work so the risks involved are managed from start to finish
  • have the right people for the right job at the right time
  • cooperate and coordinate your work with others
  • have the right information about the risks and how they are being managed
  • communicate this information effectively to those who need to know
  • consult and engage with workers about the risks and how they are being managed

The changes from CDM 2007 to CDM 2015 were substantial, the Health and Safety Executives guidance on CDM 2015, ‘Guidance on The Construction (Design and Management) Regulations 2015’, provides advice on how the law is to be complied with.

The guidance, which includes the CDM Regulations 2015, is available to view at the Health and Safety Executive website this document covers:-

  • the law that applies to the whole construction process on all construction projects, from concept to completion; and
  • what each duty holder must or should do to comply with the law to ensure projects are carried out in a way that secures health and safety

The guidance content is as follows:

  • Introduction
  • Part 1 - Commencement, interpretation and application
    • Regulation 1 Citation and commencement
    • Regulation 2 Interpretation
    • Regulation 3 Application in and outside Great Britain
  • Part 2 - Client duties
    • Regulation 4 Client duties in relation to managing projects
    • Regulation 5 Appointment of the principal designer and the principal contractor
    • Regulation 6 Notification
    • Regulation 7 Application to domestic clients
  • Part 3 - Health & Safety Duties and Roles
    • Regulation 8 General duties
    • Regulation 9 Duties of designers
    • Regulation 10 Designs prepared or modified outside Great Britain
    • Regulation 11 Duties of a principal designer in relation to health and safety at the pre-construction phase
    • Regulation 12 Construction phase plan and health and safety file
    • Regulation 13 Duties of a principal contractor in relation to health and safety at the construction phase
    • Regulation 14 Principal contractor’s duties to consult and engage with workers
    • Regulation 15 Duties of contractors
  • Part 4 - General requirements for all construction sites
    • Regulation 16 Application of Part 4
    • Regulation 17 Safe places of construction work
    • Regulation 18 Good order and site security
    • Regulation 19 Stability of structures
    • Regulation 20 Demolition or dismantling
    • Regulation 21 Explosives
    • Regulation 22 Excavations
    • Regulation 23 Cofferdams and caissons
    • Regulation 24 Reports of inspections
    • Regulation 25 Energy distribution installations
    • Regulation 26 Prevention of drowning
    • Regulation 27 Traffic routes
    • Regulation 28 Vehicles
    • Regulation 29 Prevention of risk from fire, flooding or asphyxiation
    • Regulation 30 Emergency procedures
    • Regulation 31 Emergency routes and exits
    • Regulation 32 Fire detection and fire-fighting
    • Regulation 33 Fresh air
    • Regulation 34 Temperature and weather protection
    • Regulation 35 Lighting
  • Part 5 - General
    • Regulation 36 Enforcement in respect of fire
    • Regulation 37 Transitional and saving provisions
    • Regulation 38 Revocation and consequential amendments
    • Regulation 39 Review
  • Schedule 1 Particulars to be notified under regulation 6
  • Schedule 2 Minimum welfare facilities required for construction
  • Schedule 3 Work involving particular risks
  • Schedule 4 Transitional and saving provisions
  • Schedule 5 Amendments
  • Appendix 1 The general principles of prevention
  • Appendix 2 Pre-construction information
  • Appendix 3 Construction phase plan
  • Appendix 4 Health and safety file
  • Appendix 5 Working for domestic clients
  • Glossary of acronyms and terms
  • References
  • Further reading

CDM 2015 is divided into five parts:

  • Part 1 deals with the application of CDM 2015 and definitions
  • Part 2 covers the duties of clients for all construction projects. These duties apply in full for commercial clients. However, the duties for domestic clients normally pass to other duty holders
  • Part 3 covers the health and safety duties and roles of other duty holders, including:
    • Designers
    • Principal designers
    • Principal contractors
    • Contractors
  • Part 4 contains general requirements for all construction sites
  • Part 5 contains transitional arrangements and revocations

What Our Clients Say:

Swept Path Analysis and Visibility Drawing incorporated into a Technical Note, Proposed Residential Dwelling, Colchester.

Planning permission approved finally, I am certain it was your input when you asked for the refusal to be put into writing so it can go to appeal… well done & thank you again. Nicholas Perks, Wyvern Building

Highway Statement, Proposed Residential Development, Stockport

Just want to pass on my thanks and appreciation. Your knowledge and speed at looking at the issues were incurred was superb. Hopefully we’ll have the pleasure of working together in the future. Craig Ashton, Managing Director, CPA Bespoke Joinery Ltd.

Transport Assessment, Proposed Residential Development (170 dwellings), Essex

This report is of the highest quality and detail and draws the conclusions we had hoped to see. Thanks to you and the team for this, we will certainly be using Sanderson Associates on future projects. Tom Helliwell, Managing Director, Class Q Ltd

Speed Survey, Proposed Private Residential Development – Testimonial

Thank you so much for your fast and efficient service, the speed survey was conducted efficiently and the report given has really helped our planning application process with highways moving forward. Communication from yourselves was also fantastic and swift. Would most definitely recommend you to everyone. Much appreciated! Ismail Chopdat (Private Individual)

Access Feasibility Study, Proposed Private Residential Development – Testimonial

I have recently worked on a project with Karen and Ashley at Sanderson’s and they were extremely helpful, professional and worked to my extremely tight deadline. I have no hesitation in recommending this company their attention to detail and professionalism was much appreciated. Rosie Marsh (Private Individual)

Analysis of Speed Survey and Swept Path Analysis

Brett and the Sanderson’s team were invaluable to us in obtaining highways consent which in part cleared the way for our planning application to be approved. They provided a proactive professional and personable approach to satisfy and fulfil the Cambridgeshire highways requirements. We recommend them and will use them again. Daykin Waters Waters Developments

Stage 2 Road Safety Audit, Residential, Staffordshire

Sanderson Associates were the successful bidder for carrying out a Stage 2 Road Safety Audit on behalf of TSP Projects. Their team were committed to the tight programme, and not only did they undertake the audit and agree terms and conditions in a short space of time they were receptive and flexible with planning the […]

Construction Traffic Management Plan

Sanderson Associates have been very helpful for us and our clients. They proved efficiency and competitive pricing. Thank you for your services. Andreea Raicu, Architect, Tang & Associates Ltd

Flood Risk Assessment, Testimonial, Industrial Development, Sheffield

Sanderson’s were a great in helping us with our planning application for a new material silo at our manufacturing base in Sheffield. Darren was efficient and swift in his discussions with the council on the need for a flood risk assessment on the site. Darren’s knowledge of the site and surrounding area and consequent discussions […]

Travel Plan

We have worked with Ashley, found the service very professional, efficient and cost-effective. We received the surveys and reports on time and were kept fully appraised with everything, excellent service all round. Recommend using Sanderson again in the future. Thank you, Al Ihsan Trust

Require Assistance with Detailed Design?

Sanderson Associates have enjoyed over 37 years in business, our experienced Highway Detailed Design Engineers have produced designs for a variety of developments throughout the UK, Isle of Man and Ireland.

We would be pleased to provide you with our competitive fee proposal to provide you with our Detailed Design Services, please call us on 01924 844080 or click here to complete our secure online form.

Construction (Design and Management) Regulations 2015, CDM 2015, HSE
Health and Safety Executive, The Client, The CDM Co-ordinator, The Designer
Principal Contractor, Contractors, Notifiable, Pre-Construction Information, Health and Safety File